NEWS

August 24 2013

GN Great Success on CIPPE Oil Show

The China International Offshore Oil&Gas Exhibition ( CIPPE ) was held in Shanghai, China. The main suppliers in oil & gas drilling industry comes to show like drilling rig, mud pump, BOP, solids control equipment, tools and attachments. What we bring is the solids control equipment. The show started 20th Aug and end on 21th Aug which last 3 days.GN bring our shale shaker, mud cleaner and decanter centrifuge to Shanghai for CIPPE exhibition.

GNZS703 Linear Motion Shale Shaker Spec
August 10 2013

Water Tank And Fuel Tank For Oil Drilling To ChinaWater Tank And Fuel Tank......

In oil drilling, there are different tanks for different applications. Water tank is used for storing life water for drinking and clean water for industry and fuel tank to store fuel to supply power for generator. We built 8 water tanks and 5 fuel tanks for clients which will be deliveried to clients soon.

Water Tank Main Configuration

  • Tank body with customized size
  • Water pump
  • Pipelines
  • July 27 2013

    GN Delivery 500GPM Mud System To Australia For Coal Seam Methan (CSM)

    500GPM mud system is the most popular model for coal seam methan (CSM), this 500 gmp mud system including 3 phase cleaning and mixing applications which will meet most of the CSM drilling requirement. As from year 2010, GN already deliveried several 500gpm mud sydstem to Australia and this time is a standard model.

    GN Shale Shaker

    Advantage of GN 500GPM Mud System for coal seam methan (CSM)
    July 11 2013

    GN Will Show Mud System At International No Dig Exhibition In Australia

    International No-Dig Downunder Exhibition will be held in Sydney for trenchless technology. GN Solids Control build special mud system for trenchless technology and have stand every year at No-Dig Downunder exhibition every year.

    GN200GPM Mud System at No-Dig Exhibition Melbourne 2012

    Mini Mud Cleaner
    July 25 2012

    200GPM Drilling mud cleaning unit for sale to Australia for ADIA Drill 2012

    GN has prepared one 200 GPM drilling mud cleaning unit to Australia for ADIA Drill 2012.Since 2010,GN has already shipped over 15 mud cleaning unit to Australia,and are very well acceptable by the drillers with quality and performance.

    The unit is able to handle 200-250GPM drilling mud.The system can be used for HDD,CBM,or Gas drilling for the small rigs.It consisted with one Mini GNPS703 Shale Shaker,One Linear GNZJ752-4N Mud Cleaner,two 15HP Centrigugal pumps,one mixing hopper,one mud tank with dimension:5.5x2.0x1.3m.All the equipments can stay on the tank while moving from site to site.All the handrails and electricitiy is fit for Australia standard.