NEWS

May 09 2014

GN deliveried one set 200GPM water well drilling mud system to middle east last month. Water well drilling is a kind of  vertical drilling and need mud recycling for small mud capacity.

Main Equipments Of 200GPM Water Well Mud System

  1. 5m mong mud tank for mud holding and mixing
  2. Double deck shale shaker with desilter cone
  3. 200GPM capacity for shale shaker and desilter
  4. Centrifugal pump for feeding 4x4" desilter cone
  5. 500x500mm mixing hopper and 11kw mixing pump
  6. Walkways and handrail for working purpose

Why Buy From GN For Water Well Mud System?

  1. GN is a very proffessional mud system manufacturer which has sold to more than 50 countries
  2. Experienced engineer support GN mud system gives clients best design to meet jobsite working
  3. Best material keeps best products
  4. Good team keeps good pre-sales, after sales service for mud system

GN Solids manufacturer water well mud system and other solids control system for oil drilling,CBM drilling. Please contact us freely for inquiry freely.